GTrack by Wiremo

Free Google Maps Rank Tracker

See your rank at every point on the map, and who outranks you there.

One rank number hides the truth. GTrack checks your ranking from up to 1,000 GPS points around your business and paints every result on the map, so you see exactly where customers find you and where you're invisible. Your first scan is free, no account needed.

Free trial scan, no signup · Free plan with 200 credits a month

See pricing
  • 1,000
    GPS points per scan
  • 75
    result languages
  • Daily
    automated scans
Every pin is your Google Maps rank at that exact GPS point: green where you lead, red where customers can't find you.

Free Google Maps rank checker: your first scan needs no signup

Not ready for a subscription? You don't need one. Run a single trial scan without creating an account: pick your business, type a keyword, and read your rank at every pin on the map. It doubles as a quick local SEO rank checker for any neighborhood you serve. A checker tells you where you stand today; a tracker saves every scan so you can compare this month against last month. GTrack is both, and the free plan, 200 credits a month, is where the tracking starts.

Run your free scan

Free scan without an account · No credit card · Cancel anytime

Check local rankings pin by pin: what each number and color means

A scan turns one keyword into a map of numbered pins. Each number is your Google Maps rank at that exact GPS point, so the map reads in a minute once you know what the numbers and colors say.

  • Pin number: your rank at that point

    A 3 means you were the third business Google Maps listed for a search from that spot. Click any pin to read the full top 20 there.

  • Pin color: dark green at rank 1, dark red past 20

    Green pins are where customers find you first. Red pins are where they scroll past you, and a separate marker shows the points where you're not found at all.

  • Ranking buckets: Excellent to No Rank

    The report sorts every pin: Excellent (1 to 3), Good (4 to 5), Medium (6 to 15), Poor (16 to 20), and No Rank, next to your average.

  • Competitor view: who outranks you there

    Click any competitor in the results and the whole map redraws from their side, so you see where they win and you don't.

Map rank tracker: your rank at up to 1,000 points per scan

Pick your business from Google autocomplete, enter up to five keywords, lay a local search grid over the map, and scan. Every grid point becomes a numbered pin, colored from dark green at rank 1 to dark red past rank 20, with a separate marker where you're not found at all. Most businesses discover the same thing on their first scan: green pins by the front door, red pins three kilometers away.

  • Square grids from 3×3 up to 13×13: 9 to 169 scan points per keyword
  • Custom grids: draw a rectangle, circle, or freeform polygon for up to 1,000 points
  • Pin spacing from 100 m to 10 km, with a km/mi toggle
  • Click any pin to read the full top-20 results at that exact spot
  • Click any competitor to re-render the whole grid from their perspective
  • Disable individual pins, so you only pay for the points you scan
  • Around 75 result languages and a custom zoom level from 1 to 20
  • Multi-keyword scans: each keyword gets its own ranked grid and a floating panel with its average rank
A clicked grid pin in GTrack showing the ranked Google Maps results for painters dublin at that exact GPS coordinate, each business with its rating, review count, and a competitor report button.
Click any pin to read the full top 20 at that spot. Click any competitor to re-render the grid from their perspective.

Draw your exact service area

Draw mode, on paid plans, goes past the square grid. Drag a rectangle or circle, or drop points anywhere and connect them into a freeform polygon, and GTrack fills the shape with up to 1,000 scan pins. It's city rank tracking without paying for pins you don't need.

GTrack draw mode scan of a photographer's Google Maps rank across a custom-drawn area in Tenerife: green rank 1 to 3 pins near the studio fading to red pins where the business stops ranking.
Draw a rectangle, polygon, or circle and GTrack fills it with up to 1,000 scan pins.
Run a free scan, no signup

Then 200 free credits a month, no card

Check Google Maps ranking in 4 steps

Checking your local ranking properly takes four steps. Instead of one personalized search from your own device, GTrack runs the search from every point on a grid you choose, so the result reflects what real customers see.

  1. 1

    Pick your business & keywords

    Find your Google Business Profile through autocomplete and add up to five keywords your customers actually type.

  2. 2

    Set the grid

    Choose a grid from 3×3 to 13×13 and a pin spacing from 100 m to 10 km, or, on a paid plan, draw your exact service area on the map.

  3. 3

    Run the scan

    GTrack checks your rank at every pin and returns the map: numbered pins from green where you lead to red where you're not found.

  4. 4

    Act, then automate

    Read the AI insights and fix what they flag. On any plan, put the same scan on a schedule and let GTrack run it for you.

Local rank checker vs local rank tracker: one result or the whole map

A basic local rank checker returns one result from one location, which hides where you win and where you lose. A local rank tracker like GTrack checks from many GPS points across your service area and saves every scan. Here's the difference, side by side.

GTrack local rank trackerBasic local rank checker
Data pointsHundreds of real GPS points, up to 1,000 per keywordOne averaged result
Location biasRemoved: every pin is a real coordinateBaked in and personalized
AdsExcluded from rankings and badged ADOften counted as a rank
CompetitorsEvery business in the area, ranked and comparableHidden
HistoryEvery scan saved, with side-by-side comparisonsUsually none
ReportingPDF, PNG, CSV, and live share linksA screenshot

If you only check one point, you only see one customer's view.

How GTrack measures rank

Every pin is a real Google Maps query run at that pin's exact GPS coordinate, not an IP-approximated location. You control the zoom level, 1 to 20, because Maps returns different results at different zooms, and the pin spacing, from 100 m to 10 km. Sponsored listings are excluded and labeled, so nobody buys their way into your numbers.

Check your rank at every point

Your first scan is free

Daily rank checker on autopilot: scheduled scans

Turn any scan into a recurring tracker. Pick one of seven frequencies, from daily to monthly, set the exact time of day in your timezone, and GTrack scans, emails the results, and files the history without you touching it. Same grid, same keywords, same time every week, so the trend is real and not noise.

GTrack scheduled scan history: a date timeline, one chip per tracked keyword, the interactive Google Maps ranking grid for a past run, and a Compare Scans button for side-by-side reports.
Every scheduled run keeps its interactive map, per keyword. Pick two dates for a side-by-side comparison.
GTrack daily ranking update email in Gmail: 2 improved and 0 declined positions for 11 tracked keywords, all 11 in the top 3, with the improved keywords and their position changes listed.
After every run: which keywords improved, which declined, and how many sit in the top 3, straight to any inbox you choose.
  • Seven frequencies

    Daily, every other day, weekly, every 2, 3, or 4 weeks, or monthly, at the exact time of day you choose, in your timezone.

  • Up to 30 keywords per schedule

    3 on Free up to 30 on Pro, with bulk keyword paste and AI keyword suggestions built into the form.

  • The verdict in the subject line

    Subject lines like “3 UP / 1 Down”, improved versus declined keywords, and your Top 3 and Top 10 counts against the previous period, with links to the full visual reports.

  • Reports straight to your client

    Send the digest to any email address, and give clients a live public report page per schedule that they can watch without a login.

  • Full history and scan comparison

    A date timeline with every past run's interactive map, an average-ranking trend chart, and Compare Scans: pick two dates for a side-by-side report.

  • Fair credits, instant runs

    Disabled pins are never billed and failed keywords are refunded. A Run Now button fires a single schedule, and Run All sweeps every one.

Put your rankings on a schedule

Scheduled scans on every plan: 3 keywords on Free, 5 on Starter, up to 30 on Pro

Local ranking reports you can hand to a client

Every scan becomes a report you can read in a minute and defend in a meeting. A history graph tells you whether the work is paying off; one report is just a screenshot.

GTrack Scan Analysis tab with a category analysis matrix: competitor count, average ranking, average rating, market share, and the top competitors for every business category in the scanned area.
The Scan Analysis tab maps your whole market: every category in the area, who competes in it, their average rank, and who leads.
  • Ranking distribution at a glance

    Average ranking plus a distribution chart that buckets every pin: Excellent (1 to 3), Good (4 to 5), Medium (6 to 15), Poor (16 to 20), and No Rank.

  • Every business in the scan

    A comparison of each business found in the area: average rank, best rank, times in the top 20, and visibility. One click replots the whole map for any of them.

  • Scan analysis

    An executive summary with market-leader insights, ranking volatility, and a sortable performance matrix of every competitor in the area.

  • Export to PDF, PNG, or CSV

    The CSV includes latitude, longitude, and rank for every point, ready for your own dashboards and client decks.

  • One-click share links

    Publish any scan as a live page anyone can open without a login. Business and Pro plans serve it from your own white-label domain.

  • Rescan and compare

    Re-run any scan with identical parameters for clean before-and-after data, and follow each keyword's movement in the rankings history table with trend sparklines.

Competitor tracking for any Google Business Profile

Monitor any profile on Google Maps, including ones you don't own. GTrack snapshots tracked competitors every day and emails you when something changes, so a rival's move never catches you a month late.

GTrack competitor tracking dashboard: monitored Google Business Profiles with name, reviews, categories, and photos tracked daily, plus a recent alerts feed with messages like reviews changed by +1.
Daily snapshots of any Google Business Profile, with alerts when reviews, categories, or names change.
  • Daily profile snapshots

    Business name changes, review count, categories, and photo count, with rating and posts recorded too, plus a full history log per competitor.

  • Alerts in plain words

    Daily, weekly, or monthly alert emails when a threshold trips: “Reviews changed by +12 (now 348)” or “Main category changed from X to Y.”

  • Charts over time

    Per-competitor charts for reviews, rating, photos, and posts, with custom date ranges for any window you care about.

  • One-click tracking from any scan

    Spot a rival in your scan results and press Track. No setup, no profile ownership needed.

And inside every scan, with no setup at all

  • Top Competitors Analysis ranks the 15 strongest businesses across all your pins: appearance frequency, average rank, Top 3, 5, and 10 counts, ratings, and reviews.
  • Side-by-side comparison puts you against any chosen competitor and delivers a Performance Gap verdict.
  • Local Ads Analysis lists every sponsored listing in the area: who advertises, how much of your grid their ads cover, advertiser density, and a CSV export.

AI scan insights: a strategist's read on every scan

One click turns a finished scan into a six-section written report you can save, share on a public white-label link, or export.

GTrack AI Scan Insights overview with its six report tabs: average rank, best position, consistency score, grid coverage, top-3 share, ranking distribution, and position performance.
One click turns a scan into a written report: analysis, competition, operations, and a prioritized plan.
  • Overview

    Average ranking, best position, a consistency score, and your Top 3, 5, 10, and 20 counts.

  • Performance & geography

    AI-written analysis of where you're strong, where you fade, and what the map says about why.

  • Competition

    A threat score from 0 to 100 for every rival, so you know which competitors actually endanger your visibility.

  • Operations

    Your profile completeness versus competitors (website, phone, hours, categories) plus an AI category strategy, including categories your rivals use and you don't.

  • Insights

    Visibility rate, a dominance score for the share of top-3 positions you own, volatility, risks, and opportunities.

  • Actions

    Five prioritized recommendations and a concrete this-week, this-month, three-month plan.

AI Keyword Suggestions drafts 20 ready-to-track local keyword ideas per business, covering near-me, geo, branded, and service terms, in more than 70 languages.

Curious where you actually rank?

Run your first scan without creating an account.

Free scan without an account · No credit card · Cancel anytime

GTrack for local businesses, agencies and SEO professionals

  • Local businesses

    Dentists, plumbers, restaurants, lawyers: see the neighborhoods where customers can't find you, fix the profile, and watch the map change color.

  • Local SEO agencies

    Workspaces per client, free teammates, scheduled scans, and white-label reports from your own domain. The high-touch parts of client reporting, automated.

  • SEO professionals

    Pin-level Maps data, deep organic tracking, and Search Console opportunities in one place, with exports and an API for everything else.

  • Multi-location brands

    Track every location's footprint, compare regions side by side, and catch an underperforming store before it drags the brand down.

Google Maps and organic rankings in one tool

Customers find you in two places: the Google Maps results and the organic list beneath them. GTrack tracks both, then checks the picture against your own Google Search Console data.

  • Google Maps, point by point

    The geo-grid scanner checks your Maps rank at hundreds of GPS points per keyword, up to 1,000 with a custom grid, and colors every pin from green to red, so weak neighborhoods stand out at a glance.

  • New

    Organic positions, as deep as you need

    SERP Tracker, on every paid plan, follows your organic Google position per keyword, up to 100 results deep, on mobile or desktop, from the location you set.

  • New

    Your Search Console, decoded

    Connect Google Search Console and GTrack turns 90 days of your own query data into ranked SEO opportunities with concrete next actions.

SERP Tracker · paid plans

SERP Tracker: your organic Google position on mobile or desktop

The organic results under the map are the other half of local search. SERP Tracker, included in every paid plan, follows your website's Google position for each keyword, up to 100 results deep. You pick the device per keyword (mobile, desktop, or both) and a location down to the city, so “plumber dallas” gets checked the way a searcher in Dallas sees it. The free plan and the no-signup scan cover Google Maps only.

  • Included from Starter
  • Mobile or desktop, per keyword
  • City, region or country targeting
  • Daily, weekly or monthly runs
GTrack keyword rank tracker dashboard: organic Google rank, change, previous and best position, local pack presence, monthly searches, and CPC for every keyword, each checked from a chosen location and device.
Organic positions per keyword, up to 100 results deep, from the GPS location and device you choose.
  • Proof behind every position

    GTrack parses real Google results fetched at your coordinates, and a View SERP button replays the captured page, so you can see the ranking with your own eyes.

  • The whole SERP, every check

    Organic results with sitelinks, star ratings, and review counts, plus the local pack, People Also Ask, videos, ads, and related searches, in Google's exact order.

  • Keyword data from Google Ads

    Average monthly searches, competition level, low and high CPC, and a 12-month search trend, across roughly 70 countries.

  • A dashboard that flags movement

    Average position, improved versus declined since the last run, the 10 biggest movers, and a color-banded table with rank, change, previous, best, searches, CPC, and ranking URL.

  • Ranking history per keyword

    A ranking chart over time with Page 1 and Page 2 boundary lines, fed by scheduled runs (daily, weekly, or monthly, at the hour and timezone you set) or a manual Run Tracking.

Unique to GTrack

Competitors found for you, changes caught in the act

Every domain that appears in your tracked SERPs becomes a monitored competitor, with content snapshots per run and a line-by-line diff showing what they changed on their pages when their rankings moved.

Track your organic keywords too

SERP Tracker comes with every paid plan, from $19.99 a month

New in GTrack

Google Search Console insights, turned into an action plan

Connect Search Console with a one-click, read-only Google sign-in. GTrack backfills 90 days of data, then syncs daily: every query with clicks, impressions, CTR, and position, plus true site-wide totals that match your real GSC numbers, including the anonymized queries Google hides from per-query reports.

  • 90 days backfilled
  • Synced daily
  • True site-wide totals
  • Read-only access
Every query gets a badge:Top 3Page 1Opportunity
GTrack Search Performance dashboard synced from Google Search Console: total clicks, impressions, average CTR and position, a performance-over-time chart, and the full query table.
Your Search Console property, mirrored and synced daily: every query, page, and day, ready to enrich and track.
One-click Track

Google tells you what you rank for. GTrack shows you where.

Every query in your Search Console data carries a one-click Track button that turns it into a geo-tracked keyword. Google reports your average position; GTrack then watches it daily, pin by pin.

Four automated reports from your own data

  1. 1

    Quick Wins

    Queries ranked 4 to 20 with at least 100 impressions: the easiest pushes into the top 3.

  2. 2

    CTR Opportunity

    Queries earning at least 30% fewer clicks than their position should deliver, which points at a title or meta description problem, with the cost of inaction priced in estimated impressions lost.

  3. 3

    Content Decay

    Pages losing more than 15% of impressions or more than 2 positions versus the previous period, tagged Declining, Stable, or Growing.

  4. 4

    Cannibalization

    Queries where two or more of your own pages compete and split authority, with the winning page identified.

Connect Search Console

Works with any Search Console property

Rank tracking API and MCP server for your AI assistant

Few rank trackers let your software, or your AI agent, drive them. GTrack does both.

  • REST API

    Run scans, fetch results, manage tracked businesses, and pull AI reports, on Business and Pro plans. Up to 5 keys with read and write scopes, IP allowlisting, and 2,000 to 5,000 requests per hour by plan.

  • MCP server

    Connect Claude, ChatGPT, or any MCP-capable assistant directly to GTrack. The AI launches scans and reads ranking data itself, which makes GTrack an AI-agent-ready rank tracker.

White-label local SEO reports and a workspace per client

GTrack is a local SEO tool built for agencies managing many clients: separate workspaces, free teammates, one shared credit pool, and reports that carry your brand instead of ours.

A live white-label GTrack ranking report under an agency's own branding: date timeline, tracked keywords with average ranks, and the client's Google Maps ranking grid.
Reports and share links served from your own domain, with your logo on every page.
  • Workspaces & free teammates

    A separate workspace per client with owner, admin, and member roles. Teammates cost nothing: 2 on Advanced, 5 on Business, 10 on Pro. Credits pool across all workspaces.

  • White-label on your domain

    On Business and Pro, serve every client report and share link from your own domain, like reports.youragency.com. CNAME plus automatic SSL, live in about 5 minutes, with your logo, company name, and contact details.

  • Public share links

    Every scan and every schedule history can become a live report page that needs no login. Revoke any link instantly.

  • Labels & privacy mode

    Color-coded labels organize scans with one-click filtering and bulk assignment, and Privacy Mode hides sensitive account data on screen while you present.

Start your agency workspace

Teammates are free on Advanced and up

GTrack pricing: a free plan, then paid plans from $19.99

Every paid plan bundles both products: Google Maps scan credits and a SERP Tracker allotment for organic keywords. Scan credit math is transparent: one credit per scan point per keyword, so a 3×3 scan costs 9 credits, and the exact cost shows before every scan.

Google Maps scan plans

MonthlyYearly2 months free

Free

$0forever

Try it, no card. Start without a card, no signup for the first scan.

  • 200 credits / mo
  • Scan unlimited businesses
  • Grids up to 5×5
  • 5k AI tokens
  • Scan scheduler (3 keywords)
  • Track 1 competitor
  • Public report URLs
  • 1 trial scan with no signup
Start free
  • Starter

    Single business

    $19.99/mo

    • 5,000 scan credits / mo
    • Scan unlimited businesses
    • Google Maps tracking
    • 50k AI tokens / mo (insights & keywords)
    • SERP Tracker: 1 campaign + 50 SERP credits / mo
    • Default Maps zoom and language
    • Scan scheduler with email alerts (5 keywords)
    • Public report URLs
    • Track 10 competitors (5 parameters, alerts)
    • Priority support
    Get Starter
  • Advanced

    Growing teams

    $29.99/mo

    • 15,000 scan credits / mo
    • Scan unlimited businesses
    • Google Maps tracking
    • 125k AI tokens / mo (insights & keywords)
    • SERP Tracker: 3 campaigns + 100 SERP credits / mo
    • Custom Maps zoom and language
    • Scan scheduler with email alerts (10 keywords)
    • Public report URLs
    • Up to 2 teammates
    • Track 25 competitors (5 parameters, alerts)
    • Priority support
    Get Advanced
  • Most popular

    Business

    Agencies & brands

    $59.99/mo

    • 36,000 scan credits / mo
    • Scan unlimited businesses
    • Google Maps tracking
    • 250k AI tokens / mo (insights & keywords)
    • SERP Tracker: 10 campaigns + 200 SERP credits / mo
    • Custom Maps zoom and language
    • Scan scheduler with email alerts (20 keywords)
    • Public report URLs
    • API & MCP access
    • White-label URL + branded reports
    • Up to 5 teammates
    • Track 50 competitors (5 parameters, alerts)
    • Priority support
    Get Business
  • Pro

    Established agencies

    $99.99/mo

    • 81,000 scan credits / mo
    • Scan unlimited businesses
    • Google Maps tracking
    • 500k AI tokens / mo (insights & keywords)
    • SERP Tracker: 20 campaigns + 300 SERP credits / mo
    • Custom Maps zoom and language
    • Scan scheduler with email alerts (30 keywords)
    • Public report URLs
    • API & MCP access
    • White-label URL + branded reports
    • Up to 10 teammates
    • Track 100 competitors (5 parameters, alerts)
    • 24/7 support
    Get Pro

Yearly billing gives you 2 months free, and a Lifetime plan is available · 30-day money-back guarantee on paid plans · Stripe-secured checkout · Cancel anytime · One-time credit packs from $5 never expire · AI features draw from a separate monthly AI-token pool, also top-uppable.

Add-on

Need more SERP Tracker campaigns?

Every paid plan already includes a SERP Tracker bundle, from 1 campaign on Starter up to 20 on Pro. Tracking more websites? Add a campaign pack on top: one campaign per website, with bundled SERP credits each month. Monthly only, cancel anytime.

  • +1 campaign
    $9/mo
    1,000 SERP credits / mo
  • +3 campaigns
    $24/mo
    3,000 SERP credits / mo
  • +10 campaigns
    $69/mo
    10,000 SERP credits / mo
  • +25 campaigns
    $149/mo
    25,000 SERP credits / mo
  • +50 campaigns
    $269/mo
    50,000 SERP credits / mo

Extra campaigns and SERP credits on top of your plan's bundle

Rank higher on Google Maps: 6 local SEO habits for the top three

GTrack shows where you stand. These habits move the pins toward green.

  • Master NAP consistency

    Keep your name, address, and phone identical across your Google Business Profile and every directory. Inconsistent details confuse Google and erode the trust local ranking depends on.

  • Accelerate review velocity

    A steady flow of recent, genuine reviews is one of the strongest local ranking signals. Ask every customer, reply to each review, and watch your velocity against competitors in GTrack.

  • Keep visuals fresh

    New photos and videos signal an active, real business. Stale profiles slip; updated ones hold their place. GTrack records competitors' photo counts daily, so you can see who's outworking you.

  • Post regularly

    Post about updates, offers, and events a few times a month. An empty Updates tab reads like a closed business, and GTrack records competitor posts, so you'll know if rivals go quiet.

  • Optimize for the right keywords

    Use GTrack's pin-level data and your Search Console queries to target the terms and neighborhoods you can realistically win, instead of guessing.

  • Track and shrink your service radius honestly

    Businesses that try to rank everywhere rank nowhere. Use GTrack's grid to see where your pin actually wins, double down on that zone, and stop wasting effort on neighborhoods where you'll never break top 3.

See gaps to fix? GLocal is our Google Business Profile management software for posts, reviews, and audits.

GMB ranking FAQ

How can I check my Google Maps ranking for free?

Open GTrack, pick your business, and run one trial scan with no account at all. After that, the free plan gives you 200 scan credits a month with grids up to 5×5, still without a credit card.

How do I check my GBP or GMB ranking?

Search your business name in GTrack and autocomplete finds your Google Business Profile, the listing Google used to call Google My Business. Run a scan and every pin shows where that profile ranks on Google Maps for your keyword at that exact spot.

How do scan credits work?

One credit per scan point per keyword. A 3×3 grid with one keyword costs 9 credits; the same grid with two keywords costs 18. GTrack shows the exact cost before every scan, never bills disabled pins, and refunds failed keywords. One-time credit packs start at $5 and never expire.

What makes GTrack more accurate than a basic rank checker?

Most checkers return one averaged, personalized number. GTrack queries Google Maps from real GPS coordinates at every pin in your grid, which removes location bias, and it excludes ads from rankings entirely, badging them AD instead.

Why does my ranking change from block to block?

Google weighs the searcher's location heavily, so your rank shifts with proximity, plus review velocity and competitor changes. That's why a grid of real points tells you what a single number can't: exactly where you stop showing up.

Why can't I just search Google Maps myself to check my rank?

Google personalizes what you see. Your own phone factors in your exact location, your search history, and your device, so you can look like you rank #1 at your desk and be invisible two streets over. A grid scan removes that noise by querying from neutral GPS coordinates across your whole area.

What does a scan from many GPS points show?

A scan lays a grid of GPS points over your service area and runs your keyword from every point, then colors each pin by rank: green where you rank high, red where you're missing. It replaces one misleading average with a map of where you win and where you don't.

What is the difference between a local rank tracker and a regular rank tracker?

A regular rank tracker reports one averaged position per keyword, usually measured from a data center. A local rank tracker, sometimes called a map rank tracker, measures your position from many GPS points across your area, because local results change street by street. GTrack checks up to 1,000 points per keyword and keeps the history, so you can compare over time. For the regular kind, GTrack's SERP Tracker, on paid plans, tracks your website's organic position per keyword.

What is Draw Mode?

On paid plans, you sketch any shape on the map and GTrack fills it with up to 1,000 pins. Agencies use it to cover an entire city; service businesses trace the exact area they serve, instead of scanning a square that's half ocean or half highway.

Does GTrack track the Google Local Pack?

Yes, on paid plans. A Local Pack scan checks where you appear in Google's local results at every point of your grid, and it uses 2 credits per grid point per keyword. The free plan and the no-signup scan cover Google Maps. SERP Tracker, also on paid plans, records the local pack it finds inside each saved search result, along with the rest of the page.

Can GTrack track my organic Google rankings too?

Yes, on paid plans. SERP Tracker comes with every plan from Starter ($19.99 a month) and follows your website's organic Google position for each keyword, up to 100 results deep. You set the device per keyword (mobile, desktop, or both) and a location by city, region, or country, and it re-checks daily, weekly, or monthly, or when you press Run Tracking. A View SERP button replays the captured Google page, so every position comes with proof. The Free plan and the no-signup scan cover Google Maps only.

Can I check my website's Google position for free?

Not with GTrack. The no-signup scan and the $0 plan check Google Maps rankings only. Organic position tracking is SERP Tracker, which starts on the paid plans. For a free look at your organic positions, Google Search Console's Performance report shows the average position of the queries your site appears for. Use GTrack when you want those positions checked on a schedule, per device and location.

What does the Google Search Console integration do?

You connect a property with a read-only Google sign-in. GTrack imports 90 days of queries with clicks, impressions, CTR, and position, syncs daily, and builds four reports from your own data: Quick Wins, CTR Opportunity, Content Decay, and Cannibalization. Any query becomes a geo-tracked keyword with one click.

Can I send ranking reports to my clients?

Yes. Scheduled scans email a ranking digest to any address you choose, each schedule has a live public report page clients can watch without logging in, and on Business and Pro plans every report and share link runs on your own white-label domain with your logo.

Can GTrack alert me when rankings or competitors change?

Yes, twice over. Scheduled scans email you after every run with the keywords that improved and declined. Competitor tracking watches any Google Business Profile daily and alerts you when reviews, categories, names, or photos change past your threshold.

How do I improve my ranking on Google Maps?

Scan first, so you know which neighborhoods are weak. Then work the main local signals: a complete Google Business Profile, steady recent reviews with replies, fresh photos, regular posts, and consistent name, address, and phone details everywhere. Re-scan the same grid on a schedule to confirm the work is landing.

Can I track rankings for multiple locations or franchises?

Yes. Each location gets its own scans and schedules, workspaces keep brands or clients separate, and credits pool across all of them. Multi-location brands compare regions side by side; agencies add free teammates and serve every report from their own white-label domain.

Can AI assistants like Claude or ChatGPT use GTrack?

Yes. GTrack ships an MCP server, so an AI assistant can launch scans and read ranking data directly. There's also a REST API on Business and Pro plans, and a Copy Keywords Data button that exports rankings and SERPs as structured data ready to paste into any AI chat.

Will AI assistants recommend my business if I rank well on Google Maps?

Increasingly, yes. Assistants like ChatGPT and Gemini lean on Google's local data when they suggest nearby businesses, so a profile that ranks well on Maps tends to surface in AI answers too. A rank scan doesn't measure that, though. GTrack's AI Tracker does: it asks ChatGPT, Perplexity, Gemini and Google AI Mode the questions your customers ask and records whether they name you. See the AI visibility tracker.

How long is my ranking history kept?

GTrack stores your scan history so you can run before-and-after comparisons and spot seasonal trends. Retention depends on your plan.

What's the refund policy?

Paid plans carry a 30-day money-back guarantee, checkout runs through Stripe, and you can cancel anytime. Yearly billing gives you 2 months free, and a Lifetime plan is available.

See where you really rank, free

Run one scan with no signup, fix the weak zones, and watch the pins turn green. Or start the free plan with 200 credits a month. No card either way.

  • 30-day money-back
  • No card to start
  • Help center & support